So it has been about 2 weeks since I post about the progress on the house. During that time the following items happened:

  • We passed inspection for Plumbing and Electrical
  • The outside brick was started
  • Drywall was hung
  • First coat of Drywall mud and tape applied

The builder is not wasting any time in trying to get this house done. I think it is because we are the only ones building a house right now in this neighborhood (they are building spec homes). I also think they want to get us into the home before we change out mind or something. Either way they are getting things done quickly.

Here is a slide show of the progress on the house. I am still messing around with various photo gallery websites to try to determine the one that works the best so please be patient.