From Framing to a House in 2 Weeks
So it has been about 2 weeks since I post about the progress on the house. During that time the following items happened:
- We passed inspection for Plumbing and Electrical
- The outside brick was started
- Drywall was hung
- First coat of Drywall mud and tape applied
The builder is not wasting any time in trying to get this house done. I think it is because we are the only ones building a house right now in this neighborhood (they are building spec homes). I also think they want to get us into the home before we change out mind or something. Either way they are getting things done quickly.
Here is a slide show of the progress on the house. I am still messing around with various photo gallery websites to try to determine the one that works the best so please be patient.
Leave a Reply
You must be logged in to post a comment.
Links
Categories
- Butler House (71)
- Building the House (15)
- Decorating (2)
- Landscaping (7)
- Projects (31)
- Building an Extra Room (5)
- Flat Panel TV (2)
- PorchRailing (1)
- The Fence (2)
- Repairs (10)
- Upgrades (16)
- Cami House (18)
- DIY Projects (3)
- Fence Water Seal (1)
- Window Tint (1)
- Initial Construction (12)
- DIY Projects (3)
- Links (14)
- Misc (18)
- Tools (3)
- Web Site News (18)
- Wood Working (2)