So it has been about 2 weeks since I post about the progress on the house. During that time the following items happened:
- We passed inspection for Plumbing and Electrical
- The outside brick was started
- Drywall was hung
- First coat of Drywall mud and tape applied
The builder is not wasting any time in trying to get this house done. I think it is because we are the only ones building a house right now in this neighborhood (they are building spec homes). I also think they want to get us into the home before we change out mind or something. Either way they are getting things done quickly.
Here is a slide show of the progress on the house. I am still messing around with various photo gallery websites to try to determine the one that works the best so please be patient.
Leave a Reply
You must be logged in to post a comment.
Subscribe
Links
Links
Blogroll
- 30 Something Student
- Beach House WordPress Theme
- Dan Masters Online
- Elsy’s Dream House
- Elsy’s Stay at Home Mom Blog
- Halloween Theme
- Home Improvement Tool and Toy Reviews
- idano.net
- Micro RC Reviews
- Round Rock Web Design
- Sunflower WordPress Theme
- The Abundant Life
- The Masters Family
- The Masters House
- Wood Worker Dan