So Many Things Got Done at the house Yesterday
In 2 days the house went from having mud on the drywall to having character. This is a list of what happened in the last 2 days:
- All the brick on the outside of the house is done
- Texture on the walls inside of the house
- Baseboards, door, and window trim in every room
- Doors hung in all rooms
- All cabinets in kitchen, bathrooms, and utility room
- Stair banisters in place
All that in 2 days. The had 4 different crews there yesterday alone. It is amazing the progress that they are making on the house.
I think that they may have painted inside today which would be cool.
Technorati Tags: New House,Home Construction,DR Horton,Framing,Austin TX,Round Rock TX,Plumbing,Electrical,Brick,Drywall
One Response to “So Many Things Got Done at the house Yesterday”
Leave a Reply
You must be logged in to post a comment.
Subscribe
Links
Links
Blogroll
- 30 Something Student
- Beach House WordPress Theme
- Dan Masters Online
- Elsy’s Dream House
- Elsy’s Stay at Home Mom Blog
- Halloween Theme
- Home Improvement Tool and Toy Reviews
- idano.net
- Micro RC Reviews
- Round Rock Web Design
- Sunflower WordPress Theme
- The Abundant Life
- The Masters Family
- The Masters House
- Wood Worker Dan
February 20th, 2008 at 3:08 pm
The brick looks really amazing on the outside of the house, from your previous slide show. Looks like you’ve had pretty good progress!